LOADING HOUSES
Efficient Loading. Maximum Space.
Hörmann loading houses position the entire loading bay in front of the building. This allows the facility’s interior space to remain fully usable while creating a complete, enclosed and weather-protected loading environment.
They can be combined with all the essential loading technology required for a complete solution, including dock levellers, dock shelters, industrial doors, buffers and additional safety equipment. Each component can be selected and configured according to the facility’s operational requirements, the types of vehicles being served and the required level of thermal protection. Because the building door can close directly behind the loading system, energy losses outside operating hours are reduced. Loading houses are therefore ideal for new facilities, warehouse modernisation projects and operations where internal space must be maximised.

LET’S PLAN YOUR LOADING SOLUTION
Build a Better Loading Environment.
Speak with our team about a safe, efficient and space-saving loading house solution tailored to your facility, operational requirements and loading processes.
